Guarantee the calculated work queue entry size does not exceed the max
allowable WQE size when creating an SRQ. This is a problem with Arbel
in Tavor-compatibility mode because the current WQE size computation
method rounds up to next power of 2.
Signed-off-by: Jack Morgenstein <jackm@mellanox.co.il>
Signed-off-by: Roland Dreier <rolandd@cisco.com>
ds = max(64UL,
roundup_pow_of_two(sizeof (struct mthca_next_seg) +
srq->max_gs * sizeof (struct mthca_data_seg)));
+
+ if (ds > dev->limits.max_desc_sz)
+ return -EINVAL;
+
srq->wqe_shift = long_log2(ds);
srq->srqn = mthca_alloc(&dev->srq_table.alloc);